SJF FAB Industries

Home / Services / Pre Engineered Buildings

OUR SERVICES

Pre Engineered Buildings

Pre Engineered Buildings (PEBs) epitomize meticulous design and efficient construction, incorporating a plethora of features for optimal functionality and convenience. Carefully engineered, PEBs are crafted with a focus on precision and speed, ensuring a streamlined construction process. They provide a versatile space, adeptly catering to a range of applications from industrial facilities to commercial structures. PEBs boast a lightweight structure, enhancing cost-effectiveness and facilitating quicker assembly. With durable and corrosion-resistant materials, they promise a prolonged lifespan, requiring minimal maintenance. The construction incorporates high-quality components, ensuring reliability, safety, and a comfortable indoor environment. 

It might be of Interest for you to know that alongside PEB’s, We have executed allied civil constructions for many projects on turnkey basis.

We have done projects for 1000sqft to 3Lakh sqft area in size

WHY US ?

Advantages of choosing SJF Fab Industries as an erection partner

Safety First

It is strongly recommended that the safe working conditions and accident prevention practices be the top priority on the jobsite and that local, state and safety and health standards always be followed to help ensure worker safety.

Optimal Solutions

Strive for practical and efficient approaches, considering experience and expertise to meet project requirements effectively.

Collaborative Approach

Engage in a client-centric collaboration, providing support from project inception to completion, ensuring client satisfaction.

Efficient Construction

Prioritize accelerated building processes, ensuring projects are completed promptly without compromising quality or safety.

Swift Mobilization

Quickly mobilize local teams to the project site upon order confirmation, ensuring a timely and organized commencement of the construction process.

The erection process of structural steel involves the assembly of steel components into a frame on the site which also forms the major part of the project cost. This process briefly involves lifting and placing components into position, then connecting them as a whole member, and finally bolting. So, to ensure that the processes should be completed safely, quickly, and economically, it has to be greatly influenced by the decisions made before the erection commences. Erection cost is mainly dependent on the speed of execution of erection of the structure. During the execution of erection of the structure, it is subjected to carry temporary loads which would not be the part of loading in the future. The aspects that are to be ensured during execution are safe erection procedures and structural stability of the structure.